Saturday, August 22, 2009

Plaster Mouldings

My thoughts on the Plaster Mouldings.

The plaster is unusual for calculating the deduction of doors and windows, is not significant. E 'considered a good practice, however, that the image and then allows the same figures for the quantities of material.

Plaster is usually limited to bands of fir, 1 / 4 x 11 / 2 inch and 4 feet in length. How is studding distance of 16-inch is divided into three sections, and the strip must be nailed to studs at both ends. For the 100-square-meter strip of 1500, and 10 pounds. three per cent of the nails.

The distribution is usually divided into three layers, known as zero, brown and white jackets. The first is directly on slats and consists of lime, sand and hair. The paper surface with a stick for good adhesion of the brown layer, which is less hair, but it is also very similar.

White or finishing is usually lime pulp and beach with fine sand in equal parts of plaster of Paris, for he is strong and smooth. 100 square meters, which are 10-12 foot, 2 bushels hair, 1 1 / 2 cubic meters of sand and 100 lbs. Plaster of Paris. If you want a surface sand, plaster of Paris, and is not half cubic meter of sand added. The surface is wood, finished with a float to remove sand and a rough surface.

There are other types of gypsum based on the use of gypsum in lime industry. They are faster than lime plaster, and care must be taken when following the instructions of the manufacturer. Lattes and metal panels are also far from slats of wood instead of the guards to play corner.

Slightly increase the cost, but the risk of fire. Regardless of the method, the plaster must be re-exported and skirting cube as open space to add fire. In reality, this is for the construction of most of the city.

A man a band of about 100 meters in one day eight hours, without deduction of openings. With strips of metal may be from 100 to 150 meters, but if the plan has many corners of the speed is very low. E 'was estimated that the plaster with a wizard may require about 150 m from the first two layers in a single day, and approximately 90 meters of coal is over.

Ornamental gables and ridges much to add, the cost, but are much less likely that you are still a number of years. Most of the decorations are in storage, while the strips are usually at work. In this work, the stocks must be considered in the context of the possible. These are some of the producers and can, in their catalogs.

If the drywall screwdriver is used instead of wooden slats, the first layer in May omitted or zero. This reduces the work of the forms, but the noodles are often leaks in joints between the slabs.

For the work as soon as a new type of evidence of plaster is currently on the market that are not, but ready for the processing of color or paper. It is the use of paper with the point that it is difficult to hide the link. This material is only 3 / 8 inches thick, while the plaster and laths is 7 / 8 inches. It can be used with almost no waste.

There are also a number of signs on the wall, usually a type of composition of the paste. Have reduced the demand for male, and if ever the card in card slots of the joints. The manufacturers recommend that the connections with tape to protect the wood or in a corner, but that the treatments and a pleasant side effect, almost impossible.

Plaster is much better, and the cost is much higher. These two types of wall panel 4 feet wide, and almost all couples meters.

They are very easy to implement, and where at least 20% of costs of material that normally work on the nail. This is of course very easy to work, a few corners, and not the band of wood or other wood.

No comments:

Post a Comment

Bookmark and Share